3. Before Installing the System
Transportation
1.
Pull out the Main Unit from the pallet using the carrying handles as in the image
below. (There are two handles attached to the top and bottom of the unit)
2.
Put the main unit with the EPS (Main Base) on a Transport Dolly and move it
to the installation site.
32
Lower Carrying Handle
When placing the Main Unit on the dolly, make sure
that the center of the mass indicator is aligned with
the center of the dolly.
If you move the unit manually, make sure that the
persons holding the upper handle take the lead.
vatech A9 (Model:PHT-30CSS)
Upper Carrying Handle
Installation Manual