2. Choosing an Installation Site
2.5
Exposure Switch Installation Options
You can install The Exposure Switch in three ways, based on how the user decides to
operate the equipment. However, we highly recommend our installers to install
Exposure Switch following Option No.2 to guarantee the operator's safety and the
equipment's best performance.
Option No. 1:
The user operates the Exposure Switch from inside the X-ray room.
Option No. 2:
The user operates the Exposure Switch from outside of the X-ray room. The switch
holder is mounted outside the room as well.
18
vatech A9 (Model:PHT-30CSS)
Installation Manual
Need help?
Do you have a question about the PHT-30CSS and is the answer not in the manual?
Questions and answers