5. Installing the Equipment: Wall Mount
3.
Place the equipment over the Alignment Plate to insert each Anchor Bolt into a
corresponding hole on the Column Bottom.
4.
Place the washers and nuts on Anchor Bolts. Tighten each nut loosely with a
fastener.
72
DO NOT tighten the nuts until the leveling is completed.
While one installer tightens the nuts, the other installers
should hold the middle handle to prevent the equipment
from falling.
vatech A9 (Model:PHT-30CSS)
Installation Manual
Need help?
Do you have a question about the PHT-30CSS and is the answer not in the manual?
Questions and answers