4.7
Fixing the Base (Optional)
Concrete Floor
Hammer Drill
Hammer
Ficher strong
anchor
Allen Wrench
Wrench Bolt
1.
Before installing the equipment, put the base unit on the installation site and mark 2
locations on the floor
2.
Drill the floor holes of size 12mm x 30mm (depth) using the concrete hammer drill.
3.
Remove the debris and clean the holes using the dust pump.
PaX-i Plus / Insight Installation Manual
4. Installing the Equipment: Base Stand (Optional)
L = 200 mm
(7.9")
n/a
M10 x 40
(Part No. 34)
8 mm / 0.3"
M10 x 25
w/ Spring and
Flat Washers
(Part No. 24)
55