Checklist Before Connecting To Patient - ZOE PPM3 User Manual

Nightingale monitoring system
Table of Contents

Advertisement

2.3.1.

Checklist before Connecting to Patient

Before connecting the PPM3 to a patient:
1. If connecting the PPM3 to a new patient, clean the unit according to the
instructions in the Cleaning chapter.
2. Power up the unit, confirm that the startup tones sound (two tones
followed by two higher-pitched beeps).
3. Confirm that the power-on LED is lit on the front panel.
4. Confirm that the display comes up, showing the home screen.
5. If monitoring SpO
6. Press NBP Start Stop key, confirm that pump starts.
7. Press NBP Start Stop key again, confirm that pump stops.
If you notice any problem in going through the checklist, take the monitor out of
service and contact Zoe Medical Technical Support.
April 2019
, connect sensor, confirm that LED is lit on sensor.
2
N i g h t i n g a l e P P M 3 U s e r ' s G u i d e
Getting Started
2-11

Advertisement

Table of Contents
loading

Table of Contents