Chapter 4: Installing the GS970EMX/20 Switch in an Equipment Rack

Introduction

66
Installing the GS970EMX/20 Switch in a standard 19-inch equipment rack
requires the RKMT-J13 equipment rack brackets kit. The kit allows you to
install the switch with its front panel flush with or recessed 50mm (2 in.)
behind the front of the equipment rack. Refer to Figure 33. The kit is sold
separately.
Figure 33. GS970EMX/20 Switch with RKMT-J13 Equipment Rack
Note
The GS970EMX/28 Switch comes with two equipment rack
brackets. You can install the switch in an equipment rack with the
two brackets included with the unit, or the RKMT-J13 kit.
Brackets Kit