Installing The Gs970Emx/10 Switch; Figure 28: Attaching The Rkmt-J05 Handles To The Short Brackets - Allied Telesis CentreCOM GS970EMX Series Installation Manual

Fanless gigabit layer 3 lite access switches
Hide thumbs Also See for CentreCOM GS970EMX Series:
Table of Contents

Advertisement

Chapter 3: Installing the GS970EMX/10 Switch in an Equipment Rack

Installing the GS970EMX/10 Switch

60
This section contains instructions for installing the GS970EMX/10 Switch
in a standard 19-inch equipment rack with the RKMT-J05 equipment rack
brackets kit. Here are the required items:
One RKMT-J05 rack mount brackets kit (sold separately)
Phillips-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
To install the switch in a 19-inch equipment rack with the RKMT-J05
equipment rack brackets kit, perform the following procedure:
1. Place the switch on a table.
Note
If the bumper feet are attached to the bottom on the switch, remove
them before continuing.
2. Unpack the RKMT-J05 equipment rack brackets kit and verify the
contents. Refer to Figure 19 on page 51.
3. Attach the handles in the RKMT-J05 kit to the short brackets using the
supplied M3x6mm pan head screws and a Phillips-head screwdriver.
Be sure to attach the handles to the correct sides of the short brackets
for your switch-brackets configuration. Refer to Figure 28. The handles
are optional.
Figure 28. Attaching the RKMT-J05 Handles to the Short Brackets

Advertisement

Table of Contents
loading

Table of Contents