Installing the GS970EMX/20 Switch

This section contains the procedure for installing the GS970EMX/20
Switch in standard 19-inch equipment rack with the RKMT-J13 equipment
rack brackets kit. Here are the required items:
One RKMT-J13 equipment rack brackets kit.
Cross-head screwdriver (not provided).
Flat-head screwdriver (not provided).
Four standard equipment rack screws (not provided).
To install the GS970EMX/20 Switch in a 19-inch equipment rack, perform
the following procedure:
1. Place the switch on a table.
Note
If the bumper feet are attached to the bottom on the switch, remove
them before continuing.
2. Unpack the RKMT-J13 equipment rack brackets kit and verify the
contents. Refer to Figure 21 on page 52.
3. Attach the handles to the RKMT-J13 brackets with the four 3x6mm
screws included in the kit. The handles are optional. Refer to
Figure 34.
Figure 34. Attaching the Handles to the RKMT-J13 Brackets
4. If you want to recess the front of the switch in the equipment rack
50mm (2 in.), attach the extenders to the brackets with six of the
4x8mm screws included in the kit. Refer to Figure 35 on page 68.
CentreCOM GS970EMX Series Installation Guide for Standalone Switches