Rkmt-J13 Equipment Rack Brackets Kit; Figure 21: Rkmt-J13 Equipment Rack Brackets Kit For The Gs970Emx/20 Switch - Allied Telesis CentreCOM GS970EMX Series Installation Manual

Fanless gigabit layer 3 lite access switches
Hide thumbs Also See for CentreCOM GS970EMX Series:
Table of Contents

Advertisement

Chapter 2: Beginning the Installation
RKMT-J13
Equipment Rack
Brackets Kit
52
Installing the GS970EMX/20 Switch in a standard 19-inch equipment rack
requires the RKMT-J13 brackets kit. Refer to Figure 21. The kit allows you
to install the switch with the front panel flush with or recessed 50mm (2 in.)
behind the front of the equipment rack. For instructions, refer to Chapter 4,
"Installing the GS970EMX/20 Switch in an Equipment Rack" on page 65.
Figure 21. RKMT-J13 Equipment Rack Brackets Kit for the GS970EMX/20
Note
You can install the GS970EMX/28 Switch in an equipment rack with
either the two equipment rack brackets that come with the switch or
the RKMT-J13 kit.
Two equipment rack brackets
Two bracket extenders
Two handles
Four 3x6mm screws for attaching
the handles to the brackets
Twelve 4x8mm screws for attaching
the brackets to the switch
Switch

Advertisement

Table of Contents
loading

Table of Contents