Figure 63: Management Workstation, Vt-Kit3 Management Cable, And Switch; Figure 64: Connecting The Management Cable To The Console Port - Allied Telesis CentreCOM GS970EMX Series Installation Manual

Fanless gigabit layer 3 lite access switches
Hide thumbs Also See for CentreCOM GS970EMX Series:
Table of Contents

Advertisement

Figure 63. Management Workstation, VT-Kit3 Management Cable, and
For instructions on how to start a remote management session, refer to the
GS970EMX Series Software Reference for AlliedWare Plus Operating
System.
To start a local management session with the management cable included
with the switch, perform the following procedure:
1. Power on the GS970EMX Switch. Refer to "Powering On the Switch"
on page 96.
2. Wait one minute for the switch to start the AlliedWare Plus
management software.
3. Connect the RJ-45 connector on the management cable to the
Console port on the front panel of the switch. Refer to Figure 64.
Figure 64. Connecting the Management Cable to the Console Port
4. Connect the other end of the cable to an RS-232 port on a terminal or
personal computer with a terminal emulation program.
CentreCOM GS970EMX Series Installation Guide for Standalone Switches
Switch
99

Advertisement

Table of Contents
loading

Table of Contents