Figure 45: Marking The Screw Holes For Four Brkt-J23 Brackets - Allied Telesis CentreCOM GS970EMX Series Installation Manual

Fanless gigabit layer 3 lite access switches
Hide thumbs Also See for CentreCOM GS970EMX Series:
Table of Contents

Advertisement

Figure 45. Marking the Screw Holes for Four BRKT-J23 Brackets
5. Place the switch and brackets on a table.
6. For a wooden wall, use a stud-finder to determine if there are any live
electrical wires at the screw hole locations.
7. If required, pre-drill the screw holes on the wall. For a concrete wall,
observe the following:
Set the drill to hammer and rotation mode to break up the concrete
and clean out the hole.
Clean out the holes with a brush or compressed air.
8. If required, install wall anchors.
9. Attach the bottom BRKT-J23 brackets to the wall with appropriate
screws. Refer to Figure 46 on page 82.
CentreCOM GS970EMX Series Installation Guide for Standalone Switches
81

Advertisement

Table of Contents
loading

Table of Contents