Sign In
Upload
Manuals
Brands
Allied Telesis Manuals
Switch
CentreCOM GS970EMX/28
Allied Telesis CentreCOM GS970EMX/28 Manuals
Manuals and User Guides for Allied Telesis CentreCOM GS970EMX/28. We have
2
Allied Telesis CentreCOM GS970EMX/28 manuals available for free PDF download: Installation Manual
Allied Telesis CentreCOM GS970EMX/28 Installation Manual (174 pages)
Gigabit Layer 3 Lite Access Switches with 10 Gigabit Uplinks
Brand:
Allied Telesis
| Category:
Switch
| Size: 6.72 MB
Table of Contents
Table of Contents
7
Preface
15
Document Conventions
16
Contacting Allied Telesis
17
Chapter 1: Overview
20
Front and Back Panels
20
Figure 1: Front Panel of the GS970EMX/10 Switch
20
Figure 2: Front Panel of the GS970EMX/20 Switch
20
Figure 3: Front Panel of the GS970EMX/28 Switch
21
Figure 4: Front Panel of the GS970EMX/52 Switch
21
Figure 5: Back Panels
22
Features
23
10/100/1000Mbps Copper Ports
23
1/2.5/5/10Gbps Multi-Gigabit Copper Ports
23
1/10Gbps SFP+ Ports
23
Port and System Leds
24
Installation Options
24
MAC Address Table
24
Management Software and Interfaces
24
Energy Savings
25
10/100/1000Mbps Copper Ports
26
1/2.5/5/10Gbps Multi-Gigabit Copper Ports
28
SFP+ Ports
30
Port Leds
31
10/100/1000Mbps Copper Port Leds
31
Figure 6: Speed/Activity and Duplex Mode Leds for the 10/100/1000Mbps Copper Ports
31
1/2.5/5/10Gbps Multi-Gigabit Copper Port Leds
33
Figure 7: Speed/Activity Leds for the 1/2.5/5/10Gbps Multi-Gigabit Copper Ports
33
1/10Gbps SFP+ Port Leds
34
Figure 8: Speed/Activity Leds for the 1/10Gbps SFP+ Ports
34
Eco-Friendly Button
36
Switch ID LED
37
Figure 9: Switch ID LED
37
Figure 10: Switch ID LED with Eco-Friendly Mode off (Port Leds On)
37
Figure 11: Switch ID LED with Eco-Friendly Mode on (Port Leds Off)
38
USB Port
39
Console Port
40
Power Supply and Power Savings Features
41
Chapter 2: Virtual Chassis Stacking
43
Overview
44
Stacking Guidelines
45
Stack Trunks
46
SFP+ Ports S1 and S2
46
Figure 12: Stack Trunks of SFP+ Ports S1 and S2 for Two Switches
47
Figure 13: Stack Trunks of SFP+ Ports S1 and S2 for Three Switches
47
Figure 14: Stack Trunks of SFP+ Ports S1 and S2 for Four Switches
48
Figure 15: Mixed Stack of GS970EMX Switches
48
Multi-Gigabit Copper Ports
49
Figure 16: Chain Stack Trunk of SFP+ Ports S1 and S2
49
Figure 17: Stack Trunks of Multi-Gigabit Copper Ports for Two Switches
49
Figure 18: Stack Trunks of Multi-Gigabit Copper Ports for Three Switches
50
Figure 19: Stack Trunks of Multi-Gigabit Copper Ports for Four Switches
50
Unsupported Trunks
51
Figure 20: Chain Stack Trunk of Multi-Gigabit Copper Ports
51
Figure 21: Unsupported Trunk of Multi-Gigabit Copper Ports and SFP+ Ports S1 and S2
51
Figure 22: Unsupported Trunk of SFP+ Ports S1 and S2 with Mixed Cables
52
Figure 23: Unsupported Trunk with a Network Device between Trunk Ports
53
Master and Member Switches
54
Switch ID Numbers
55
Feature Licenses
56
Planning the Stack
57
Specifying Ports in the Command Line Interface
58
Figure 24: PORT Parameter in the Command Line Interface
58
Vcstack Worksheet
60
Chapter 3: Beginning the Installation
65
Reviewing Safety Precautions
66
Choosing a Site for the Switch
70
Site Requirements
70
Enclosure Requirements
71
Unpacking the Switch
72
Figure 25: Accessory Items Included with the GS970EMX/20 Switch
72
Figure 26: Accessory Items Included with the GS970EMX/28 Switch
73
Figure 27: Accessory Items Included with the GS970EMX/52 Switch
74
Installation Options
75
GS970EMX/20 Switch
75
Figure 28: Installation Options for the GS970EMX/20 Switch
75
GS970EMX/28 Switch
76
Figure 29: Installation Options for the GS970EMX/28 Switch
76
GS970EMX/52 Switch
77
Figure 30: Installation Options for the GS970EMX/52 Switch
77
Hardware Options
78
RKMT-J13 Equipment Rack Brackets Kit
78
Figure 31: RKMT-J13 Equipment Rack Brackets Kit for the GS970EMX/20 Switch
78
BRKT-J24 Wall Brackets Kit
79
Figure 32: BRKT-J24 Wall Brackets Kit for the GS970EMX/20 and GS970EMX/28 Switches
79
Recording the Serial Number and MAC Address
80
Figure 33: Serial Number and MAC Address Labels
80
Installing the Switch on a Table
81
Figure 34: Switch Installation on a Table
81
Figure 35: Unsupported Table Installations
81
Figure 36: Attaching the Bumper Feet
82
Figure 37: Attaching Bumper Feet on the GS970EMX/52 Switch
83
Chapter 4: Installing the GS970EMX/20 Switch in an Equipment Rack
85
Introduction
86
Figure 38: GS970EMX/20 Switch with RKMT-J13 Equipment Rack Brackets Kit
86
Installing the GS970EMX/20 Switch
87
Figure 39: Attaching the Handles to the RKMT-J13 Brackets
87
Figure 40: Attaching the Extenders to the RKMT-J13 Brackets
88
Figure 41: Attaching the RKMT-J13 Brackets to the GS970EMX/20 Switch
88
Figure 42: Securing the GS970EMX/20 Switch in a Standard 19-Inch Equipment Rack
89
Chapter 5: Installing the GS970EMX/28 Switch in an Equipment Rack
91
Introduction
92
Figure 43: GS970EMX/28 Switch Installed in a Standard 19-Inch Equipment Rack
92
Installing the GS970EMX/28 Switch
93
Figure 44: Attaching the Equipment Rack Brackets to the GS970EMX/28 Switch
93
Figure 45: Securing the GS970EMX/28 Switch in a Standard 19-Inch Equipment Rack
94
Chapter 6: Installing the GS970EMX/52 Switch in an Equipment Rack
95
Introduction
96
Figure 46: Bracket Screw Holes on the GS970EMX/52 Switch
96
Figure 47: Equipment Rack Bracket Positions for the GS970EMX/52 Switch
96
Installing the GS970EMX/52 Switch
97
Figure 48: Attaching the Equipment Rack Brackets to the GS970EMX/52 Switch
97
Figure 49: Securing the GS970EMX/52 Switch in a Standard 19-Inch Equipment Rack
98
Chapter 7: Installing GS970EMX/20, GS970EMX/28, and GS970EMX/52 Switches on a Wall
100
Installation Guidelines
100
Figure 50: GS970EMX/20 and GS970EMX/28 Switches on a Wall with the BRKT-J24 Brackets Kit
100
Figure 51: GS970EMX/52 Switch on a Wall
100
Figure 52: Unsupported Wall Installation of the GS970EMX/20, GS970EMX/28, and GS970EMX/52 Switches
101
Plywood Base for a Wall with Wooden Studs
103
Figure 53: GS970EMX Switch on a Wall with a Plywood Base
103
Figure 54: Steps to Installing GS970EMX Switches on a Plywood Base
104
Installing the Switch
105
Figure 55: Attaching the BRKT-J24 Wall Brackets to the GS970EMX/20 and GS970EMX/28 Switches
106
Figure 56: Attaching the Wall/Equipment Rack Brackets to the GS970EMX/52 Switch
106
Figure 57: Attaching the Wall/Equipment Rack Brackets to the GS970EMX/52 Switch (Continued)
107
Figure 58: Marking the Locations of the Bracket Holes
108
Chapter 8: Displaying the Hardware Status and Alliedware Plus Version Number
109
Powering on the Switch
110
Figure 59: Installing the Power Cord Retaining Clip
110
Figure 60: Connecting the AC Power Cord
110
Figure 61: Lowering the Power Cord Retaining Clip
111
Figure 62: Connecting the Power Cord to an AC Power Outlet
111
Starting a Local Management Session
112
Figure 63: Management Cable Included with Switch
112
Figure 64: VT-Kit3 Management Cable
112
Figure 65: Local Management with the VT-Kit3 Management Cable
113
Displaying the Hardware Status and Alliedware Plus Version Number
115
Figure 66: Disconnecting the Power Cord from the AC Power Source
115
Chapter 9: Building Stacks with SFP+ Ports S1 and S2
117
Introduction
118
Powering on the Switches Sequentially
119
Powering on the Switches Simultaneously
121
Verifying the Stack and Assigning Priority Numbers
123
Figure 67: SHOW STACK Command
123
Figure 68: Moving to the Global Configuration Mode with the ENABLE and CONFIGURE TERMINAL Commands
124
Figure 69: Returning to the Privileged Exec Mode
125
Figure 70: Saving the Priority Values with the WRITE Command
125
Figure 71: SHOW STACK Command with New Switch Priority Values
125
Chapter 10: Building Stacks with Multi-Gigabit Copper Ports
127
Introduction
128
Command Summary
129
STACK ENABLE Command
129
STACKPORT Command
129
STACK PRIORITY Command
130
STACK RENUMBER Command
131
SWITCH PROVISION Command
132
Configuring the Master Switch
133
General Steps for the Master Switch
133
Configuring the Master Switch - Part I
134
Configuring the Master Switch - Part II
136
Verifying the Master Switch
138
Figure 72: SHOW STACK Command on the Master Switch
138
Figure 73: SHOW RUNNING-CONFIG INTERFACE Command on the Master Switch
139
What to Do Next
140
Figure 74: Powering off the Switch
140
Configuring Member Switches
141
General Steps for Member Switches
141
Configuring Member Switches - Part I
142
Configuring Member Switches - Part II
143
Verifying Member Switches
145
Figure 75: SHOW STACK Command for a Member Switch
145
Figure 76: SHOW RUNNING-CONFIG INTERFACE Command for Member Switches
146
What to Do Next for Member Switches
147
Powering on the Stack
148
Chapter 11: Cabling Copper and SFP+ Ports
149
Cabling Copper Ports
150
Guidelines to Handling SFP and SFP+ Transceivers
151
Installing 1Gbps SFP and 10Gbps SFP+ Transceivers
152
Figure 77: Installing an SFP+ Transceiver
152
Figure 78: Removing the Dust Cover from an SFP+ Transceiver
153
Figure 79: Positioning the SFP+ Handle in the Upright Position
153
Figure 80: Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver
154
Installing SP10TW Direct Connect Twinax Cables in SFP+ Ports
155
Figure 81: Installing an SP10TW Cable
155
Chapter 12: Troubleshooting
157
Appendix A: Technical Specifications
161
Physical Specifications
162
Figure 82: Dimensions of the GS970EMX/10 Switch
162
Figure 83: Dimensions of GS970EMX/20 and GS970EMX/28 Switches
163
Figure 84: Dimensions of the GS970EMX/52 Switch
163
Figure 85: Bracket Screw Holes on GS970EMX/20 and GS970EMX/28 Switches
164
Figure 86: Bracket Screw Holes on the GS970EMX/52 Switch
165
Environmental Specifications
166
Power Specifications
169
Certifications
171
Copper Port Pinouts
173
Figure 87: Pin Layout for the RJ-45 Copper Ports (Front View)
173
Style Serial Console Port Pinouts
174
Advertisement
Allied Telesis CentreCOM GS970EMX/28 Installation Manual (126 pages)
Fanless Gigabit Layer 3 Lite Access Switches
Brand:
Allied Telesis
| Category:
Switch
| Size: 6.04 MB
Table of Contents
Table of Contents
7
Preface
13
Document Conventions
14
Contacting Allied Telesis
15
Chapter 1: Overview
18
Front and Back Panels
18
Figure 1: Front Panel of the GS970EMX/10 Switch
18
Figure 2: Front Panel of the GS970EMX/20 Switch
18
Figure 3: Front Panel of the GS970EMX/28 Switch
19
Figure 4: Back Panels
19
Features
20
10/100/1000Mbps Copper Ports
20
1/2.5/5/10Gbps Multi-Gigabit Copper Ports
20
1/10Gbps SFP+ Ports
20
Port and System Leds
21
Installation Options
21
MAC Address Table
21
Management Software and Interfaces
22
Energy Savings
22
10/100/1000Mbps Copper Ports
23
1/2.5/5/10Gbps Multi-Gigabit Copper Ports
25
SFP+ Ports
27
Port Leds
28
10/100/1000Mbps Copper Port Leds
28
Figure 5: Speed/Activity and Duplex Mode Leds for the 10/100/1000Mbps Copper Ports
28
1/2.5/5/10Gbps Multi-Gigabit Copper Port Leds
30
Figure 6: Speed/Activity Leds for the 1/2.5/5/10Gbps Multi-Gigabit Copper Ports
30
1/10Gbps SFP+ Port Leds
31
Figure 7: Speed/Activity Leds for the 1/10Gbps SFP+ Ports
31
Eco-Friendly Button
32
Switch ID LED
33
Figure 8: Switch ID LED
33
Figure 9: Switch ID LED with Eco-Friendly Mode off (Port Leds On)
33
Figure 10: Switch ID LED with Eco-Friendly Mode on (Port Leds Off)
34
USB Port
35
Console Port
36
Figure 11: Management Cable Included with Switch
36
Figure 12: VT-Kit3 Management Cable
36
Figure 13: VT-Kit3 Management Cable, Management Workstation, and Switch
37
Power Supply and Power Savings Features
38
Chapter 2: Beginning the Installation
39
Reviewing Safety Precautions
40
Choosing a Site for the Switch
44
Site Requirements
44
Enclosure Requirements
45
Unpacking the Switch
46
Figure 14: Accessory Items
46
Figure 15: Equipment Rack Brackets Included with the GS970EMX/28 Switch
47
Installation Options
48
GS970EMX/10 Switch
48
Figure 16: Installation Options for the GS970EMX/10 Switch
48
GS970EMX/20 Switch
49
Figure 17: Installation Options for the GS970EMX/20 Switch
49
GS970EMX/28 Switch
50
Figure 18: Installation Options for the GS970EMX/28 Switch
50
Hardware Options
51
RKMT-J05 Equipment Rack Brackets Kit
51
BRKT-J23 Wall Brackets Kit
51
Figure 19: RKMT-J05 Equipment Rack Brackets Kit for the GS970EMX/10 Switch
51
Figure 20: BRKT-J23 Wall Brackets Kit for the GS970EMX/10 Switch
51
RKMT-J13 Equipment Rack Brackets Kit
52
Figure 21: RKMT-J13 Equipment Rack Brackets Kit for the GS970EMX/20 Switch
52
BRKT-J24 Wall Brackets Kit
53
Figure 22: BRKT-J24 Wall Brackets Kit for the GS970EMX/20 and GS970EMX/28 Switches
53
Installing the Switch on a Table
54
Figure 23: Switch Installation on a Table
54
Figure 24: Unsupported Table Installations
54
Figure 25: Attaching the Bumper Feet
55
Chapter 3: Installing the GS970EMX/10 Switch in an Equipment Rack
57
Introduction
58
Figure 26: GS970EMX/10 Switch in an Equipment Rack with the RKMT-J05 Brackets Kit
58
Figure 27: GS970EMX/10 Switch with RKMT-J05 Cable Trays
59
Installing the GS970EMX/10 Switch
60
Figure 28: Attaching the RKMT-J05 Handles to the Short Brackets
60
Figure 29: Attaching the Short RKMT-J05 Brackets to the Long Brackets
61
Figure 30: Attaching the RKMT-J05 Cord Trays to the Long Brackets
62
Figure 31: Attaching the RKMT-J05 Brackets to the Switch
63
Figure 32: Attaching the GS970EMX/10 Switch to an Equipment Rack
64
Chapter 4: Installing the GS970EMX/20 Switch in an Equipment Rack
65
Introduction
66
Figure 33: GS970EMX/20 Switch with RKMT-J13 Equipment Rack Brackets Kit
66
Installing the GS970EMX/20 Switch
67
Figure 34: Attaching the Handles to the RKMT-J13 Brackets
67
Figure 35: Attaching the Extenders to the RKMT-J13 Brackets
68
Figure 36: Attaching the RKMT-J13 Brackets to the GS970EMX/20 Switch
68
Figure 37: Securing the GS970EMX/20 Switch in a Standard 19-Inch Equipment Rack
69
Chapter 5: Installing the GS970EMX/28 Switch in an Equipment Rack
71
Introduction
72
Figure 38: GS970EMX/28 Switch Installed in a Standard 19-Inch Equipment Rack
72
Installing the GS970EMX/28 Switch
73
Figure 39: Attaching the Equipment Rack Brackets to the GS970EMX/28 Switch
73
Figure 40: Securing the GS970EMX/28 Switch in a Standard 19-Inch Equipment Rack
74
Chapter 6: Installing the GS970EMX/10 Switch on a Wall
76
Introduction
76
Figure 41: GS970EMX/10 Switch with Two BRKT-J23 Wall Brackets
76
Figure 42: GS970EMX/10 Switch with Four BRKT-J23 Wall Brackets
77
Figure 43: Unsupported Wall Installation with Front Panel Facing down
77
Installation Guidelines
78
Installing the GS970EMX/10 Switch
79
Figure 44: Marking the Screw Holes for Two BRKT-J23 Brackets
80
Figure 45: Marking the Screw Holes for Four BRKT-J23 Brackets
81
Figure 46: Attaching the Bottom BRKT-J23 Brackets to the Wall
82
Figure 47: Sliding the Switch into the BRKT-J23 Brackets
83
Figure 48: Attaching the Top BRKT-J23 Brackets to the Wall
84
Chapter 7: Installing GS970EMX/20 and GS970EMX/28 Switches on a Wall
86
Installation Guidelines
86
Figure 49: GS970EMX/20 and GS970EMX/28 Switches on a Wall
86
Figure 50: Unsupported Wall Installation
86
Installing GS970EMX/20 and GS970EMX/28 Switches on a Wooden Wall
88
Plywood Base for a Wall with Wooden Studs
88
Figure 51: GS970EMX Switch on a Wall with a Plywood Base
88
Figure 52: Steps to Installing GS970EMX Switches on a Plywood Base
89
Installing the Switch on a Plywood Base
90
Figure 53: Attaching the BRKT-J24 Wall Brackets to the GS970EMX Switch
90
Figure 54: Securing the GS970EMX Switch to the Plywood Base
91
Installing GS970EMX/20 and GS970EMX/28 Switches on a Concrete Wall
92
Figure 55: Marking the Locations of the BRKT-J24 Bracket Holes on a Concrete Wall
93
Figure 56: Securing the GS970EMX Switch on a Concrete Wall
94
Chapter 8: Verifying the Switch
95
Powering on the Switch
96
Figure 57: Installing the Power Cord Retaining Clip
96
Figure 58: Connecting the AC Power Cord
96
Figure 59: Lowering the Power Cord Retaining Clip
97
Figure 60: Connecting the Power Cord to an AC Power Source
97
Starting a Local Management Session
98
Figure 61: Management Cable Included with Switch
98
Figure 62: VT-Kit3 Management Cable
98
Figure 63: Management Workstation, VT-Kit3 Management Cable, and Switch
99
Figure 64: Connecting the Management Cable to the Console Port
99
Figure 65: User Exec Mode Prompt
100
Displaying the Hardware Status and Disabling Vcstack
101
Figure 66: Moving to the Global Configuration Mode
101
Figure 67: Confirmation Prompt for the no STACK ENABLE Command
102
Figure 68: Returning to the Privileged Exec Mode
102
Figure 69: Saving the Changes with the WRITE Command
102
Chapter 9: Cabling Copper and SFP+ Ports
105
Cabling Copper Ports
106
Guidelines to Handling SFP and SFP+ Transceivers
107
Installing 1Gbps SFP and 10Gbps SFP+ Transceivers
108
Figure 70: Installing an SFP+ Transceiver
108
Figure 71: Removing the Dust Cover from an SFP+ Transceiver
109
Figure 72: Positioning the SFP+ Handle in the Upright Position
109
Figure 73: Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver
110
Installing SP10TW Direct Connect Twinax Cables in SFP+ Ports
111
Figure 74: Installing an SP10TW Cable
111
Chapter 10: Troubleshooting
113
Appendix A: Technical Specifications
117
Physical Specifications
118
Figure 75: Dimensions of the GS970EMX/10 Switch
118
Figure 76: Dimensions of GS970EMX/20 and GS970EMX/28 Switches
119
Figure 77: Bracket Screw Holes on GS970EMX/20 and GS970EMX/28 Switches
119
Environmental Specifications
121
Power Specifications
122
Certifications
123
Copper Port Pinouts
125
Figure 78: Pin Layout for the RJ-45 Copper Ports (Front View)
125
Style Serial Console Port Pinouts
126
Advertisement
Related Products
Allied Telesis GS970EMX/10
Allied Telesis CentreCOM GS970EMX Series
Allied Telesis CentreCOM GS970EMX/20
Allied Telesis CentreCOM GS970EMX/52
Allied Telesis CentreCOM GS970M Series
Allied Telesis CentreCOM GS970M/10
Allied Telesis CentreCOM GS970M/10PS
Allied Telesis CentreCOM GS970M/18
Allied Telesis CentreCOM GS970M/18PS
Allied Telesis CentreCOM GS970M/28
Allied Telesis Categories
Switch
Network Router
Media Converter
Network Hardware
Wireless Access Point
More Allied Telesis Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL