Allied Telesis CentreCOM GS970EMX Series Installation Manual page 10

Fanless gigabit layer 3 lite access switches
Hide thumbs Also See for CentreCOM GS970EMX Series:
Table of Contents

Advertisement

Figures
Figure 50: Unsupported Wall Installation ..............................................................................................................................86
Figure 51: GS970EMX Switch on a Wall with a Plywood Base ............................................................................................88
Figure 52: Steps to Installing GS970EMX Switches on a Plywood Base .............................................................................89
Figure 53: Attaching the BRKT-J24 Wall Brackets to the GS970EMX Switch......................................................................90
Figure 54: Securing the GS970EMX Switch to the Plywood Base .......................................................................................91
Figure 55: Marking the Locations of the BRKT-J24 Bracket Holes on a Concrete Wall .......................................................93
Figure 56: Securing the GS970EMX Switch on a Concrete Wall .........................................................................................94
Figure 57: Installing the Power Cord Retaining Clip .............................................................................................................96
Figure 58: Connecting the AC Power Cord...........................................................................................................................96
Figure 59: Lowering the Power Cord Retaining Clip.............................................................................................................97
Figure 60: Connecting the Power Cord to an AC Power Source ..........................................................................................97
Figure 61: Management Cable Included with Switch............................................................................................................98
Figure 62: VT-Kit3 Management Cable ................................................................................................................................98
Figure 63: Management Workstation, VT-Kit3 Management Cable, and Switch..................................................................99
Figure 64: Connecting the Management Cable to the Console Port ....................................................................................99
Figure 65: User Exec Mode Prompt....................................................................................................................................100
Figure 66: Moving to the Global Configuration Mode .........................................................................................................101
Figure 67: Confirmation Prompt for the NO STACK ENABLE Command ..........................................................................102
Figure 68: Returning to the Privileged Exec Mode .............................................................................................................102
Figure 69: Saving the Changes with the WRITE Command...............................................................................................102
Figure 70: Installing an SFP+ Transceiver..........................................................................................................................108
Figure 71: Removing the Dust Cover from an SFP+ Transceiver ......................................................................................109
Figure 72: Positioning the SFP+ Handle in the Upright Position ........................................................................................109
Figure 73: Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver .....................................................................110
Figure 74: Installing an SP10TW Cable..............................................................................................................................111
Figure 75: Dimensions of the GS970EMX/10 Switch .........................................................................................................118
Figure 76: Dimensions of GS970EMX/20 and GS970EMX/28 Switches............................................................................119
Figure 77: Bracket Screw Holes on GS970EMX/20 and GS970EMX/28 Switches ............................................................119
Figure 78: Pin Layout for the RJ-45 Copper Ports (Front View) .........................................................................................125
10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CentreCOM GS970EMX Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents