To install the GS970EMX/10 Switch on a wall, perform the following
procedure:
1. Place the switch on a table or desk.
Note
If the bumper feet are installed on the bottom panel of the switch,
remove them before continuing.
2. Unpack the BRKT-J23 wall brackets kit and verify the contents. Refer
to Figure 21 on page 52.
3. Have another person hold the switch on the wall at the selected
location and orientation. Be sure to leave sufficient space from other
devices or walls so that you can access the front and back panels.
4. Position the brackets on the wall and mark the bracket screw holes.
Refer to Figure 44 and Figure 45 on page 81.
Figure 44. Marking the Screw Holes for Two BRKT-J23 Brackets