Cisco 12416 Installation And Configuration Manual page 366

Cisco systems bridge/router installation and configuration guide
Hide thumbs Also See for Cisco 12416:
Table of Contents

Advertisement

Removing and Replacing the DC-Input Power Shelf
Seat the power shelf to the chassis
Step 9
a.
b.
The DC-input power shelf weighs approximately 10.2 pounds (4.6 kg). Use two
Warning
hands to remove the power shelf.
Figure 7-45 Seating the DC-Input Power Shelf
jackscrew
Reconnect the ground and each pair of power cables to the DC-input terminal
Step 10
studs as follows
Be sure to connect the cables according to the color coding notes and labels you
Caution
made in
Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and Configuration Guide
7-74
Tighten the ejector jackscrew.
Tighten the captive screws on each flange.
Ejector
(Figure
7-46):
Step
4.
Chapter 7
(Figure
7-45):
Captive screws
(2 on each side)
Maintaining the Router
OL-11495-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

1281612016

Table of Contents