Installation tests
Result:
was standby is now active. Transmission should take a momentary hit as it is switched
to the other pack. This information should agree with the ACTIVE LEDs on the
LNW6/LNW7 or LNW8 circuit packs.
........................................................................................................................................................................................................................
6
Repeat
pack, with the same results as the previous step.
........................................................................................................................................................................................................................
Check off the appropriate box in
7
E
O
N D
........................................................................................................................................................
DS1 path switching test (manual)
Important!
however this procedure should be performed on each Function Unit Slot pair.
........................................................................................................................................................................................................................
Select Fault -> Protection Switch...
1
........................................................................................................................................................................................................................
Under Path Protection, click on Path m-1-1-1-1.
2
........................................................................................................................................................................................................................
Click Select.
3
........................................................................................................................................................................................................................
At the Switch Type: pull-down, select Manual.
4
........................................................................................................................................................................................................................
Click Apply.
5
Result:
the active path, the switch is from m2 to m1).
The Switch Request State: indicates Manual Switch.
........................................................................................................................................................................................................................
At the Switch Type: pull-down, select Clear.
6
........................................................................................................................................................................................................................
Click Apply.
7
............................................................................................................................................................................................................................................................
4 - 1 6
The pack that was active should now be the standby pack and the pack that
Step 1
through
Step 5
S
F
T E P S
It is not mandatory to perform this test on each vt cross-connection,
The Active Path: indicates a change from m1 to m2 (or if m2 was originally
to verify a switch back to the original Function Unit circuit
Appendix E, "Installation
DS1 protection switching
checklist".
365-372-304R7.1
Issue 1, November 2007