ESA Functional Tests
Frequency Readout Accuracy
Figure 4-5 Equipment Setup
Figure 4-6 Equipment Setup
Procedure
1. Connect the equipment as shown in
10 MHz REF OUT of the analyzer to the 10 MHz REF IN of the synthesized sweeper.
2. Perform the following steps to set up the equipment:
a. Press
INSTRUMENT PRESET
follows:
, 1.490,
CW
GHz
POWER LEVEL
164
Figure 4-5
on the synthesized sweeper, then set the controls as
, 10,
– dBm
or
Figure
4-6. Remember to connect the
Chapter 4