1. Pre-check and Source Linearity Calibration (PRE CHECK)
Note
Once this calibration is performed, all of the calibration data stored in the
E4915A/E4916A will be lost. You must perform the whole adjustments and
performance tests to obtain the complete calibration data.
Required Equipment
Attenuator Pad 20dB
N(f)-BNC(m) Adapter
N(m)-BNC(f) Adapter
BNC(m)-BNC(m) Cable, 30 cm
Power Splitter
Procedure
1. Connect the equipment as shown in Figure 2-3.
Figure 2-3. Pre-check and Source Linearity Calibration Setup
2. Select \PRE CHECK" and click
3. Following the program instructions, complete this procedure.
8491A Opt.020
PN 1250-1477
PN 1250-1476,
E4915A: 1ea, E4916A: 4ea
PN 8120-1838,
E4915A: 1ea, E4916A: 3ea
11667A (E4916A)
NNNNNNNN
OK in the list box of the program display.
Adjustments and Performance Tests 2-9