Verify:
The left side hosts the parts that have been imported.
By selecting each part displays the part, shows the layers that are present, and gives the part details.
In the LAYERS, toggling the check boxes for the layers will display which portion of the drawing is assigned to which
layer in the display.
If needing to change to a different process, use the drop down list to assign that layer to the process.
By setting to IGNORE, will drop out that layer from the toolpath process.
After validating, at the bottom of the screen, press Export All Parts.
The Part List will display the part along with the tool path that is assigned. Once validated, press ADD JOB.
When VERIFY is checked, the operations will be moved to the Part Import Preview screen.
This screen allows the operator to evaluate the drawings, toggle layers, assign layers to
processes.