Lincoln Electric TORCHMATE 5100 User Manual page 26

Hide thumbs Also See for TORCHMATE 5100:
Table of Contents

Advertisement

To power up your Torchmate 5100 CNC machine, the following items need to be powered up; Machine and
Plasma Unit. The machine will power the controller, computer, and touchscreen. The switch is located on the
rear of the machine. The power button for the plasma power supply is located on the front of the unit.
1.
Power up the machine by using the ON/Off switch. (Located at the back left of the machine)
2.
The VMD Application will auto start with the computer, wait for control panel to load.
3.
Verify the EMERGENCY STOP(s) are disengaged by turning the RED EMERGENCY STOP button
clockwise. One on the non-cable carrier side of the gantry and one above the monitor.
4.
Press the GREEN BUTTON above the Operators Console. (This will power the motors)
5.
Press DATUM. (Machine will seek back left corner)
Back Left
Corner
Gantry
(Machine Zero)
E-Stop
3
Torchmate 5100
Power Up the 5100
1
14
4
3
5

Advertisement

Table of Contents
loading

Table of Contents