When installing a Lincoln Electric CNC Cutting System in your shop, there are many factors that will influence the
potential productivity, ease of use of the machine and the safety of the operator. The main factors to prepare for
include: the physical placement of the machine, the availability of power, an EMI ground, compressed air, other
input gases, and ventilation.
Please Note:
When preparing to install the Lincoln Electric CNC Cutting System, provide sufficient space. Three feet of work
space (914 mm) should be obstacle free around the machine.
Side load material opposite the cable carrier only! Utilize the back of the machine to park the gantry while loading
material.
A dedicated earth ground must be provided and should be installed in a manner to reduce trip hazard.
5100
167"
Load From
This Side
Torchmate 5100

Site Preparation

14" Duct, Downdraft
Models Only
113.25"
MAINTAIN WORK AREA
15' Power Cord, NEMA 5-15P
Earth Ground
Incoming AC power
FlexCut
Plasma
(within 10' of cable
carrier)
Operator
Console
8
Shop Air Supply
(provided by customer)
for Plasma Cutter
Shop air supply