10 Troubleshooting
5. After the new O-ring is in place, insert the sample tube back into the sample port until it is
fully seated.
6. Slide the sample tube connector nut up the tube until it comes in contact with the port fitting
(the ferrule and O-ring will move along with the connector nut). Then, turning clockwise,
hand tighten the connector nut to the sample connector.
R
ECOVER FROM A
The analyzer saves entered and collected data in case of power failure. File parameters and any
other data entered will still be present when power is restored. If an analysis was in progress when
the power failure occurred, it will be canceled when the analyzer restarts. Any data collected
during the analysis will still be present, but the analysis should be restarted in order to produce
complete results.
O
-
V
IL
BASED
ACUUM
The Vacuum Pump Guide can be found on the Micromeritics web page (www.Micromeritics.com).
10 - 26
P
F
OWER
AILURE
P
UMP
Gemini VII Operator Manual
239-42828-01 (Rev H ) — May 2021
Need help?
Do you have a question about the GEMINI VII and is the answer not in the manual?
Questions and answers