DO NOT connect or disconnect cables when the instrument is powered ON.
If a Smart VacPrep is used, it is recommended that the power to the Smart VacPrep remain ON
when the analyzer is powered on. If it does become necessary to power off the Smart VacPrep,
exit the analyzer program first. Restart the analyzer program, then power on the Smart VacPrep.
Power ON the equipment in the following order:
1. Computer, monitor, and printer.
2. Analyzer.
3. External vacuum pump (the pump must warm approximately two hours before performing
analyses).
4. Degasser.
Power OFF the equipment in the following order
1. Exit the analysis program. Failure to do so could result in loss of data. If an analysis is in pro-
gress when closing the application, the following message is displayed:
2459 - An Instrument is busy. A delay in restarting this application
could result in loss of new data. Continue program exit? Yes / No
Yes. Closes the program. The analysis continues and data continue to be collected. The
data will be restored when the application is restarted. Reports queued in the print
manager will print. If a power failure occurs and an uninterruptible power supply (UPS) is
not attached to the analyzer, the data collected after exiting the analysis program are lost.
No. The program remains open and the analysis continues to run.
2. Computer, monitor, and printer.
3. Analyzer.
4. External pump.
5. Smart VacPrep.
10 - 22
O
O
N AND
FF
Gemini VII Operator Manual
239-42828-01 (Rev H ) — May 2021

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GEMINI VII and is the answer not in the manual?

Questions and answers

Table of Contents