Testing The Reusable Breathing Circuit; Checking The System For Leaks - Weinmann MEDUMAT Standard2 Instructions For Use Manual

Ventilator
Hide thumbs Also See for MEDUMAT Standard2:
Table of Contents

Advertisement

9 Function check

9.5 Testing the reusable breathing circuit

Requirement
Result

9.6 Checking the system for leaks

Requirement
Result
210
EN
MEDUMAT Standard
The patient valve of the reusable breathing circuit is dismounted
(see "8.4 Disassembly of the reusable breathing circuit",
page
176).
1. Check all parts of the patient valve for external damage.
If necessary: Replace damaged parts.
2. Check the PEEP control diaphragm and inspect the check valve
diaphragm:
If the diaphragm is torn, wavy, distorted or sticky: Replace the
diaphragm.
3. Assemble the reusable breathing circuit
reusable breathing circuit", page
The patient valve of the reusable breathing circuit has been
checked and is ready for use.
The device is connected to the oxygen supply.
1. Open the valve of the oxygen cylinder slowly.
The pressure gauge on the pressure reducer indicates the
pressure in the oxygen cylinder.
2. Close the valve on the oxygen cylinder.
3. Observe the pressure gauge on the pressure reducer for
approx. 1 min:
If the position of the needle remains constant:
the system is free from leaks
If the needle falls, there is a leak in the system
4. If necessary: Rectify the leak
(see "9.7 Rectifying leaks in the system", page
The system has been checked for leaks.
2
(see "8.10 Assembling
190).
211).

Advertisement

Table of Contents
loading

Table of Contents