Preparations For Final Check; Entering Device Data; Testing For Leaks And Checking Pressure Reading - Weinmann MEDUMAT Basic Servicing And Repair Instructions

Ventilators
Table of Contents

Advertisement

3.2 Preparations for final check

1. Connect MEDUMAT Basic / Basic p to pressure supply 4.5 – 6 bar of cylinder system.
2. Connect respiration tube and pressure measurement tube to MEDUMAT Basic / Basic p.
3. Set MEDUMAT Basic / Basic p with switch in position No Air Mix to Freq. = 30 min
and P
= 45 mbar.
max
4. Start check.

3.3 Entering device data

Enter the device number and date of manufacture in the Test Record.

3.4 Testing for leaks and checking pressure reading

3.4.1 Testing for leaks on the inlet side
With device switched off, apply pressure of 6 bar to inlet side and shut off outlet pressure.
Set lever to
No Air Mix.
The pressure drop must be less than 0.2 bar/min.
Requirement:
Set lever to
Air Mix.
The pressure drop must be less than 0.2 bar/min.
Requirement:
3.4.2 Testing for leaks in pressure measurement segment
Apply pressure of 60 mbar to pressure measurement segment of MEDUMAT Basic / Basic p.
During the measurement, a traction force of approx. 3 N must be applied manually to the elbow outlet.
The pressure drop must be less than 2 mbar/min.
Requirement:
3.4.3 Checking pressure reading
1. Attach T-connector with injector (WM 15359)
to pressure measurement connection
2. Connect test pressure gauge 0 - 100 mbar or
Timeter to free end of T-connector (pressure
gauge/volumetric flowmeter not supplied with
device).
3. Use injector to create a pressure of 55 mbar
as shown on the test pressure gauge.
Requirement: Respiration pressure reading must not
deviate from set value by more than ≤ ≤ ≤ ≤ 1.5 mbar.
.
13
Pressure gauge
-1
, MV = 3 l/min
Test pressure
®
AT
M ED UM
Ba si c
gauge
O / I
Injector
Final Check
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Medumat basic pWm 22600Wm 22650

Table of Contents