3-4 Bank switching
Multi-task and Bank Data
Multi-task Function
With the ZW-7000 Series, you can set multiple measurement processing for one sensing setting. This
measurement processing is called a "task (TASK)."
Example: When measuring height and side run-out at the same time
For tasks, TASK1 to TASK4 are available for registration.
You can measure and judge up to four characteristic points simultaneously because you can specify the
desired measurement items such as peak, bottom, and average for each task.
Measurement processing flow in TASK1
Measurement processing flow in TASK4
86
Bank switching
Surface fluctuation (TASK2)
Height (TASK1)
* For the output, the following four types are
supported:
- Analog output
Select one TASK that you want to output.
- Judgment output
Select one TASK that you want to output.
- Serial output (Ethernet/RS-232C)
Allows output of four data of the following:
Results of TASK1 to TASK4, exposure
time, peak value of received light.
- Fieldbus output (EtherCAT / EtherNet/IP)
Allows output of four data of the following:
Results of TASK1 to TASK4, exposure
time, peak value of received light.
ZW-7000 User's Manual