Mounting The Cosy Heating And The Power Supply Unit (Optional) - Dräger Fabius plus Instructions For Use Manual

Anesthesia workstation
Hide thumbs Also See for Fabius plus:
Table of Contents

Advertisement

Mounting the COSY heating and the
power supply unit (optional)
The compact breathing system can be operated
heated. This reduces the condensation of moisture
in the breathing system during low-flow operation
(fresh-gas flow less than 1 L/min).
 Before installation of the COSY heating, the
leakage test must be performed, see chapter
''Leakage test'' on page 135.
Follow the assembly instructions for breathing
system heating (9038262 and 8605899).
Establishing the power supply of the breathing
system heating
1 Plug in the connector of the heating cable (A)
in the corresponding socket (B) on the bottom
of the compact breathing system. When doing
so align the red mark of the plug to the red
mark of the socket.
 After installation of the breathing system
heating, perform the leakage test on Fabius.
Instructions for use Fabius plus SW 3.n
A
B
The heating must be switched off if it is not being
used. This will prevent drying out of the soda lime.
WARNING
Risk due to soda lime drying out
The soda lime loses moisture. If the moisture
falls below the minimum moisture, the
following adverse reactions occur
independent of the type of soda lime and
inhalational anesthetic used: Decreased CO
absorption, increased generation of heat in
the CO
absorber resulting in increased
2
breathing gas temperature, formation of CO,
absorption and/or degradation of the
inhalational anesthetics.
– Do not use unnecessarily high fresh-gas
flows.
Only use the supplemental O
necessary.
– Do not leave the flow control valves open
unnecessarily long.
Assembly and preparation
delivery if
2
2
65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents