Tire And Wheel Installation - Landoll Brillion SL10 Operator's Manual

Hide thumbs Also See for Brillion SL10:
Table of Contents

Advertisement

Tire and Wheel Installation

Use a torque wrench to assure proper torque.
Insufficient torque can cause stud breakage and
damage the wheel pilots. Over torque can stress
the Bolts and strip the threads.
NOTE
The tire/wheel assembly is mounted with the valve stem
facing outward from Hub and Spindle.
IMPORTANT
Torque will drop after the first 10 hours of operation.
Check the Wheel Bolts for proper torque after this
interval and re-tighten them.
• The Seeder uses 9.5L-15, 8 Ply Rating Tires and
should be inflated to 44 PSI.
• Install a Tire and Wheel Assembly onto each Hub
with 1/2-20 x 1 Wheel Bolts and tighten Wheel Bolts
to 50 Ft-Lbs using the sequence in Fig 2-7. Then
tighten to a full torque of 80-85 Ft-Lbs.
1P342-0621
WARNING
Bolt,1/2-13 x 3
Wheel Arm
Locknut,
1/2-13
Figure 2-8: Hub and Spindle
Figure 2-7: Tightening Sequence
Spindle
Hub
ASSEMBLY
Tire and Wheel
Assembly
Wheel Bolt,
1/2-20 x 1
2-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents