Download Print this page

Knoll Antenna Telescope Installation Instructions Manual page 52

Hide thumbs Also See for Antenna Telescope:

Advertisement

Telescope 120˚ Triad with Beam
(with or without Dual Utility Trays)
INSTALL THE HEIGHT ADJUSTMENT
ELECTRICAL COMPONENTS:
NOTE: To achieve proper lifting
performance with 120 Degree
Stations, the power supply must
be plugged into the center leg.
25. Plug splitter into one port on middle leg.
Temporarily tape power supply to rail near
middle leg. Plug power supply directly
into other outlet on middle leg housing.
26. Connect middle leg to each outer leg,
by plugging a LONG iDrive cable into
splitter and also into one port of the leg.
Repeat, plugging second LONG iDrive
cable into splitter and one port of second
leg. (See Wiring Diagram on Pg 57)
27. Decide whether handset will be on
Right or Left end of 120 Top. Plug
SHORT iDrive cable into leg on selected
side. Connect Handset to other end
of iDrive cable. Allow to dangle onto
floor until after top is attached.
PERFORM A RESET FOR THE TRIO
OF COLUMNS IN EACH STATION:
28. Plug the power supply into a temporary
power source. Ensure the red LED
on the power supply lights.
29. Apply approximately 100 lbs. of weight
to the rails. Press and hold both UP and
DOWN buttons for ten seconds. After
releasing the buttons, press and hold the
DOWN BUTTON until all three columns
bottom out. Press the UP button and the
station will be ready to perform normally.
Remove the weight. Run the station all the
way up and down again to ensure there
are no issues with the columns.
Repeat the procedure above
for the other two stations.
©2021 Knoll Inc.
ENSURE COLUMNS ARE PLUMB
THROUGHOUT RANGE OF TRAVEL:
To avoid issues that may arise if columns
are forced out of alignment during usage,
a thorough check is required at this point
in the installation. If adjustment is required,
it is best to adjust at the mid-column
cradles, if possible. Rail adjustments made
here are hidden, allowing the correct
outset of the rail caps at the outer ends.
If additional rail adjustment is required,
then make those adjustments at the outer
cradles. Free movement of the columns
takes priority over the rail cap outset.
30. Using a laser level, or similar, ensure that
the upper column elements are in line and
paralleling the lower column tube, made
plumb at Step 21. Make rail adjustments,
described above, as needed, to retain
column tube alignment throughout the
range of travel.
ATTACH CONNECTOR LINKS/ CONNECT
TABLES (WHERE APPLICABLE):
31. Attach (2) Dovetail Linking Brackets (BB)
to the outside of the outer crossbar
using (2) 1/4 -20 x ¾" flat head machine
screws (CC) per bracket. The base of
the "L" should be oriented downward.
32. Prepare the Connector Link (EE) for the
Wire Hanger (DD) by loosely screwing (2)
¼-20 x 3/4" button head machine screws
(V) into the underside of the connector
link. Leave a gap of about ³/
the head of the screws. Place the wire
hanger over the heads of the screws and
slide to engage the keyhole slots.
NOTE: Repeat the above two steps
for the outer crossbar and Connector
Link of the connecting table assembly.
33. To connect tables, position both
table assemblies side by side so the
prepared connector links (EE) can be
slid down onto the linking brackets (BB)
previously attached to the crossbars.
Fasten the connector links to the linking
brackets with a ¼ -20 x ¾" flat head
machine screw (CC) at each end.
INSTALL TOPS:
34. Lay tops on base assembly. Place a
Spacer (Q) between the top of each rail
and the underside of the top, centered
on the width of the top. Spacers are
attached to the top using (1) #12 X ¾" flat
head black wood screw (R) per spacer.
NOTE: Back to back tops are to be 6"
apart.
35. Attach tops using (4) #14 x 1" flat head
wood screws (S) per outer Horizontal Rail
Cradle (C), and (2) #14 x 1" flat head wood
screws (S) per center cradle cavity in 120
Degree Center Rail Cradle (GG/HH).
NOTE: Several screw hole locations
are directly above the crossbars, so it is
convenient to raise the station to make
room for the power driver.
NOTE: Do NOT force columns out
of alignment to align pilot holes with
cradle holes. If worksurface pilot holes
do not align with cradle holes, drill new
pilot holes, as needed. Use a drill bit
depth stop to prevent drilling through
the top surface of the worktop.
36. Attatch Power Supply bracket to
underside of top using (2) #8 x 3/4
Pan Head Screw provided. Place
Power Supply onto bracket so that
the red LED is visible from below.
AFFIX HANDSET:
" beneath
37. Using (2) #6 x
16
(K) mount the Handset Control
Switch (J) to the underside of the
worktop, at the front edge.
INSTALL POWER STRIP ACCESSORY
(WHERE APPLICABLE):
See Power Strip Installation Instructions.
INSTALL CLEAT PLATE & CLEAT
PLATE COVER ACCESSORIES
(WHERE APPLICABLE):
See Cleat Plate and Cleat Plate
Cover Installation Instructions.
INSTALL Z MANAGER ACCESSORY
(WHERE APPLICABLE):
See Z-Manager Installation Instructions.
Antenna Telescope Installation Instructions
120 º TRIAD BASES
52
/
" wood screws
5
8

Advertisement

loading