Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook page 230

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

(3) Starting the simulator for the GOT to check the created screen
Start GT Simulator3 from GT Designer3 (GOT2000) to check the created screen.
App - 46
1.
Select [Tools] → [Simulator] → [Set] from the
menu bar of GT Designer3 (GOT2000).
1.
2.
When the dialog shown left appears, select GX
Simulator2 for Connection.
3.
Click the [OK] button to complete the settings.
2.
3.
4.
Select [Tools] → [Simulator] → [Activate] from
the menu bar of GT Designer3 (GOT2000).
Debug the program after starting the GT
Simulator3.
4.

Advertisement

Table of Contents
loading

Table of Contents