(b)
Connection method for the Ethernet connection cable
(3) Access the PLC by GX Works2.
The following describes the procedures for monitoring the PLC by GX Works2 using the FA transparent function.
Refer to the GX Works2 Operating Manual for details on operation procedures for GX Works2.
(a)
Connecting to PLC
(Next page)
Connect the Ethernet connection cable to the GOT.
1.
In the [Navigation] window of GX Works2, select
[Connection Destination] - [Current Connection]
and double-click [Connection1].
1.
1
2
3
4
5
6
App - 31