Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook page 80

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

P
O
I
N T
P
O
I
N
Checking package data
Check whether the package data has been properly written to the GOT using GT Designer3.
4 - 32
4. From GOT screen creation up to the test
4.5 Checking whether data has been properly transferred to the GOT
1.
Click [Communication] - [Read from GOT] from
the menu.
2.
The [Communicate with GOT] dialog appears.
2.
Select [Drive Information] in [Read Data].
3.
3.
Select [C:Built-in Flash Memory] in [Source
4.
Drive].
4.
Click the
5.
The list of the items that have been written to
the drive is displayed in the tree.
When the following items can be checked, the
package data has been properly written to the
GOT.
Standard System Application
5.
•Communication driver:
button.
Ethernet(MELSEC),Q17n
NC,CRnD-700,Gateway

Advertisement

Table of Contents
loading

Table of Contents