Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook page 53

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

(From previous page)
P
O
I
N T
P
O
I
N
If GT Designer3 (GOT1000) starts while GT Designer3 is running, start GT Designer3 (GOT2000) by using
one of the following methods.
(1) Click [Project] → [Start GT Designer3 (GOT2000)] from the menu of GT Designer3 (GOT1000).
(2) Select [GOT2000] and click the [Next] button in the [New Project Wizard] dialog of GT Designer3
(GOT1000).
10.
Click the
10.
11.
The left screen is displayed.
Confirm the settings.
Click the
11.
4. From GOT screen creation up to the test
button.
button.
4.2 Screen creation