Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook page 170

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

(From previous page)
6 - 14
6. About debug
6.3 Sequence program monitor (Ladder)
9.
10.
Touch
[Display].
(Next page)
9.
On the [PLC Read] screen, select [Program
Memory] from the target drive list of [PLC Drive]
to list the files stored in the drive.
10.
Touch the
sequence program displayed in the file list.
11.
Touch the
sequence program to the data storage device
selected in the target drive list of [GOT].
11.
12.
The reading of the sequence program is
completed.
The [Program list] window appears.
13.
Touch the
key to select the
key to write the
.
key

Advertisement

Table of Contents
loading

Table of Contents