Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook page 58

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

(From previous page)
P
P
O
O
I NT
I
Ethernet setting
When the GOT is connected to the Ethernet port built in the QnUDVCPU or other PLC CPUs via the Ethernet
connection, the setting items [Net No.] and [Station] do not exist on the PLC side. However, virtual values need to
be set for the items when the device setting is configured on the GOT side as [Net No.] and [Station] are used to
identify the CPU.
Setting virtual values is required only for the Ethernet connection with built-in Ethernet PLCs. For the QJ71E71
connection, the Net No. and station number set to the module are required.
R
e
m
a r
k
R
e
m
a
k
• For the details of [Controller Setting], refer to the GOT2000 Series Connection Manual (Mitsubishi Products).
• [Controller Setting] can also be performed with the GOT Utility.
• For the details of [Controller Setting] in the utility, refer to the GOT2000 Series User's Manual (Utility).
4 - 10
4. From GOT screen creation up to the test
4.2 Screen creation
7.
Configure the Ethernet setting as follows.
Net No.: 1 (Virtual)
Station: 2 (Virtual)
Unit Type: QnUD(P)V/QnUDEH
IP Address: 192.168.3.39
Port No.: 5006
Communication: UDP
7.
8.
Click the
8.
button.

Advertisement

Table of Contents
loading

Table of Contents