Mitsubishi Electric Fatec GOT2000 Series Basic Training Textbook page 81

Graphic operation terminal
Hide thumbs Also See for Fatec GOT2000 Series:
Table of Contents

Advertisement

P
O
I NT
P
O
I
Checking that the GOT recognizes the connected equipment
Check that the GOT recognizes the connected equipment with the GOT utility.
To avoid problems, always perform checks.
Utility call key
Hold down the upper left corner
for two seconds.
Touch
[Controller].
(Next page)
4.
4. From GOT screen creation up to the test
4.5 Checking whether data has been properly transferred to the GOT
1.
Power ON the GOT.
2.
The screen described in section 4.3.3
appears. Hold down the upper left corner on
the GOT monitor screen for two seconds.
3.
The utility screen appears. Touch [Controller]
in the [GOT basic set] tab.
4.
In [Communication setting], touch [Assign
Ethernet I/F].
1
2
3
4
5
6
4 - 33

Advertisement

Table of Contents
loading

Table of Contents