For details, see
6.
Install the front cover of the crossbar box.
For details, see
23.6
Restoring the System
This section describes the procedure for restoring the system after installing the
operation panel.
1.
Turn on the CB switches of the dedicated power distribution unit (PDU)
mounted on the rack for expanded connection.
Open the rear door of the rack, and push in all the CB switches on the PDU.
Electricity is supplied when the switches stay pushed in.
2.
Start the entire system.
For details, see
3.
Close the rack door.
"19.5.1 Installing a fan
"6.5.3 Installing the front
"6.4 Starting the Entire
Chapter 23 Maintaining the Operation Panel of the Crossbar Box
unit."
cover."
System."
369