23.5.1
Installing the operation panel
1.
Set the BB-ID of the operation panel to the value prior to the start of
maintenance.
2.
Insert the operation panel into the fan shelf and then secure it with the screw.
Figure 23-8 Installing the operation panel
3.
Reinstall the cable between the fan shelf and the operation panel.
Front
Chapter 23 Maintaining the Operation Panel of the Crossbar Box
367