Inspection and Installation

♦ Verifying the Shipment

♦ Instrument Size Introduction
♦ Rack Mounting
♦ Connecting the Power Cord
♦ Connecting the Device Under Test (DUT)
♦ Connect the Communication Interface
2.1 Verifying the Shipment
Unpack the box and check the contents before operating the instrument. If
wrong items have been delivered, if items are missing, or if there is a defect with
the appearance of the items, contact the dealer from which you purchased the
instrument immediately.
Table 2–1 Package box contents
Item
Bi-directional
programmab-
le DC power
supply
Power Cord
Multiple
instruments
connection
cables
Ex-Factory
Test Report
Model
Qty.
-
IT-M3400
series
X 1
-
X 1
-
X 1
-
Copyright © Itech Electronic Co., Ltd.
Inspection and Installation
Remarks
This series
include:1.8
User may select an appropriate power
cord that matches the specifications of
power socket used in the area. See the
Section
2.4 Connecting the Power
Cordfor details.
When the user needs to connect the
System Bus interfaces between
Multiple instruments in parallel
operation, multichannel operation and
synchronized operation features, this
option is the right choice.