Cal Power IT-M3400 Series User Manual page 109

Table of Contents

Advertisement

b. Connect the DUTs. Refer to
(DUT)
for more information about connection methods.
3. Turn on the Link switch of each instrument in turns.
a. Press [Shift]+[P-set] (System) to enter into the system menu interface.
b. Use left and right keys or rotate the knob to select Link and press
[Enter] key to make the parameter in modification.
c. Rotate the knob to set Status and press [Enter] key to confirm.
Online: indicates the instrument is in the synchronized relationship.
Offline: indicates the instrument is not in the synchronized
relationship.
d. Rotate the knob to set Mode and press [Enter] key to confirm.
OnOff Only
Track→Reference
Duplicate
Copyright © Itech Electronic Co., Ltd.
Multi-Machine Operation
2.5 Connecting the Device Under Test
98

Advertisement

Table of Contents
loading

Table of Contents