Site Planning
10-32 OR 12-24 SCREWS

Special Considerations

3-8
M10 NUT FOR
JUNCTION PANEL
GROUND STUD
(QTY 2)
M6 ZINC PLATED
STEEL SCREWS
(QTY 4)
1U BLANK PANEL
(QTY 2)
M6 BLACK SCREWS
Figure 3-3
Assembly for mounting in a Power Supply cabinet
Breaker Panel Access
The National Electrical Code (NEC) requires a 36" clearance for electrical
service access to all fuse panels, breaker panels, etc., and requires that all
doors to this equipment open to at least 90˚.
M6 NUT FOR
JUNCTION PANEL
GROUND STUD
(QTY 3)
JUNCTION PANEL
M4 SCREWS
(QTY 12)
Gen 3 Site Controller System Manual
ATTACH GROUND
BRACKET FOR STATIC
STRAP WHERE NEEDED
MAIN BRACKET
(QTY 2)
ANGLE BRACKET
(QTY 4)
ISC301
050401JNM
68P80801E30-A 5/1/2002

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents