Alarm action and alarm responses — continued
If you do this . . .
Switch off the RFS1 breaker of RFC2
Switch off the RFS1 breaker of RFC3
Switch off both RFS1&2 breakers of
RFC1
Switch off both RFS1&2 breakers of
RFC2
Switch off both RFS1&2 breakers of
RFC3
Switch off the AC circuit breaker for
rectifier 1 at the site power panel
Switch off any breaker in the Power
Supply rack **
If possible, turn off the AC power for
rectifiers 1 and 2 in the Power Supply
rack
Switch off any RF Cabinet 1 breaker
Switch off any RF Cabinet 2 breaker
Switch off any RF Cabinet 3 breaker
* Only present on RF Cabinets containing cavity combining RF Distribution Systems.
** Breaker alarms may take time to appear.
Gen 3 Site Controller System Manual
Then this alarm triggers . . .
RFC 2 circuit breaker and combiner/
multicoupler power supply
RFC 3 circuit breaker and combiner/
multicoupler power supply
RFC 1 combiner/multicoupler
amplifier
RFC 1 combiner/power supply
RFC 1 circuit breaker
RFC 1 tower top amplifier *
RFC 2 combiner/multicoupler
amplifier
RFC 2 combiner/power supply
RFC 2 circuit breaker
RFC 2 tower top amplifier *
RFC 3 combiner/multicoupler
amplifier
RFC 3 combiner/power supply
RFC 3 circuit breaker
RFC 3 tower top amplifier *
AC power failure
Minor rectifier alarm
Power system breaker fail
Major rectifier alarm
RFC 1 circuit breaker
RFC 2 circuit breaker
RFC 3 circuit breaker