Chapter Overview

68P80801E30-A 5/1/2002
This chapter provides pre-installation information for a site controller. Refer
to the EBTS System Manual (on CD: 98P80800A17) for EBTS-wide
pre-installation issues.
A pre-installation site review and evaluation helps prevent potential
equipment installation problems. Consider every subject discussed in this
chapter before site controller installation.
The following table lists this chapter's topics
Section
Receipt of Equipment
Site Planning
Electrical
Requirements
Grounding
Requirements
Antenna Installation
Alarm Wiring
Recommended Tools,
Equipment, and Parts
Global Telecom Solutions Sector
1301 E. Algonquin Road, Schaumburg, IL 60196
Pre-Installation
Chapter 3
Page
This section . . .
3-2
describes unpacking procedures, equipment
inventory, and equipment inspection
3-3
covers site considerations relating to the site
controller
3-12
defines the requirements for AC power,
transfer switch, breaker panel configuration,
rectifier wiring, surge arrestors, cabinet power,
and an optional back-up generator
3-15
defines the grounding standards, installation of
ground rings, antenna tower grounding, site
grounding, and equipment grounding
3-19
describes GPS antenna considerations, color
coding and identification, and surge
suppression
3-22
describes the connection of smoke detectors,
burglar alarms, and temperature sensors
3-29
lists the recommended tools, equipment, and
parts required for installation
3