ABB Levelmeter 2000 Instructions Manual page 76

Table of Contents

Advertisement

3 Calibration
3.17. Updating revolution counters
Step
Storing the revolution counter setting with the FlexPendant
This procedure details the second step when updating the revolution counter; storing the
revolution counter setting with the FlexPendant (RobotWare 5.0).
Step
74
Action
6.
Press OK again to confirm and start the update.
CANCEL returns to the Revolution Counter Update window.
7.
At this point, it is recommended that the revolution counter
values are saved to a diskette.
8.
-
Caution!
If a revolution counter is incorrectly updated, it will cause
incorrect robot positioning, which in turn may cause damage or
injury!
Check the calibration position very carefully after each update.
How to perform the check is detailed in section
calibration position
on page 23.
Action
1.
On the ABB menu, tap Calibration.
All mechanical units connected to the system are shown along with their calibration
status.
2.
Tap the mechanical unit in question.
A screen is displayed: tap Rev. Counters.
en0400000771
Note
Not required.
Checking the
3HAC 022907-001 Revision: -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents