Led Indicators; Installation Instructions - ATTO Technology FibreBridge 1180D Installation And Operation Manual

Atto technology fibrebridge 1180d bridges: user guide
Hide thumbs Also See for FibreBridge 1180D:
Table of Contents

Advertisement

LED indicators

The faceplate shows two dual-stacked LEDs and
a single LED. The green dual-stacked LED
indicates FC activity, the other FC link speed.
Another green dual-stacked LED indicates SCSI
activity on each of the SCSI ports, and the single
LED indicates Ready status.
The LED blinks to show activity on
FC Activity:
the Fibre Channel port (numbered 0). During very

Installation instructions

1
Mount the FibreBridge in your device.
2
Connect a SCSI device to the FibreBridge.
Connect the Fibre Channel port to your
SAN.Connect the Ethernet cable from the Fibre
Bridge to your computer. Refer to
page 3.
3
Connect the power connector.
4
Apply power.
Exhibit 1.4-1 Board layout showing mounting holes and connectors.
high activity, the LED may appear to be steadily
lit.
FC Link Speed:
FibreBridge is using 2-Gigabit.
SCSI Activity:
(numbered 0 and 1).
Ready:
to indicate the board has completed the
initialization process without any failures and is
ready to handle data transfers.
5
Access FibreBridge Services using the
QuickNAV utility. Refer to
FibreBridge
6
Go to the ExpressNAV Restart page and
restart the FibreBridge.
Cabling
on
7
Map your devices.Refer to
67.
8
Boot the computers on the SAN and check the
configuration. Refer to
configurations
a lit LED indicates the
shows activity on the SCSI bus
should light after power has been applied
Configuring the
on page 64.
Mapping
Additional
on page 17.
Installation: FibreBridge 1290E
on page
14

Advertisement

Table of Contents
loading

Table of Contents