On the AC output side an automatic magnetothermic switch should be inserted
between the Aurora inverter and the distribution grid (see Fig. 9. - Electrical
Connection Diagram).
On the DC input side a DC switch should be inserted when not integrated in the
inverter. The –S models have an integrated DC switch 600V-25A
WARNING: To reduce the risk of fire, connect only to a circuit provided
with 20A maximum branch circuit overcurrent protection in accordance with
the National Electric Code (ANSI/NFPA 70)