Siemens SINAMICS DCM Operating Instructions Manual page 405

Dc converter
Hide thumbs Also See for SINAMICS DCM:
Table of Contents

Advertisement

Ramp-function generator mode of operation
= Ramp-function generator setpoint
RUT
= Rampup time
IR
= Initial rounding
1)
Transition from ramp-down incline to ramp-up incline
2)
Initial rounding makes the transition to final rounding even before the maximum ramp-down incline is reached.
3)
Only the last part of final rounding is performed here due to the ramp-function generator setpoint jump.
Figure 10-35 Ramp-function generator mode of operation
SINAMICS DCM DC Converter
Operating Instructions, 1.2012, C98130-A7066-A1-05-7619
= Ramp-function generator output
RDT
= Ramp-down time
FR
= Final rounding
Descriptions of functions
10.9 Setpoint channel
403

Advertisement

Table of Contents
loading

Table of Contents