GE 90-30 PLC Series Installation And Hardware Manual page 87

Hide thumbs Also See for 90-30 PLC Series:
Table of Contents

Advertisement

3
Modular CPU, Expansion, and Remote Baseplate Dimensions
Baseplate dimensions and spacing requirements for installation for Modular CPU baseplates are
shown below.
Figure 3-16. Modular CPU, Expansion, and Remote 5-Slot Baseplate Dimensions and Spacing
Requirements
*
4.00
(102)
3.54
(90)
.79
NOTE:
(20)
*
Figure 3-17. Modular CPU, Expansion, and Remote 10-Slot Baseplate Dimensions and Spacing
Requirements
3-18
Series 90-30 PLC Installation and Hardware Manual – August 2002
10.43
4.00
*
(265)
(102)
9.84
(250)
POWER
SUPPLY
3.54
(90)
.79
FRONT VIEW
(20)
NOTE:
If the cable is used, allow about 6 inch horizontal clearance
on the right side of the rack for access to the connector.
*
Allowance for cooling
17.44
(443)
16.85
(428)
15.60
(396)
POWER
SUPPLY
FRONT VIEW
IF THE CABLE IS USED, ALLOW ABOUT 6 INCH HORIZONTAL CLEARANCE
ON THE RIGHT SIDE OF THE RACK FOR ACCESS TO THE CONNECTOR.
ALLOWANCE FOR COOLING
4.00
*
(102)
8.60
(218)
SEE
NOTE
.20 DIA.
(5.08)
(TYPICAL)
*
4.00
(102)
*
SEE
NOTE
.20 DIA.
(5.08)
(TYPICAL)
*
DIMENSIONS IN INCHES,
MILLIMETERS ARE IN PARENTHESIS
4.00
*
(102)
REMOVABLE
5.59
I/O
(142)
TERMINAL
BLOCK
5.12
(130)
HINGED
SIDE VIEW
DOOR
4.00
*
(102)
DIMENSIONS IN INCHES,
MILLIMETERS ARE IN PARENTHESIS
4.00
(102)
REMOVABLE
I/O
5.59
TERMINAL
(142)
BLOCK
5.12
CONNECTOR
(130)
FOR
EXPANSION
CABLE
HINGED
SIDE VIEW
DOOR
4.00
(102)
GFK-0356Q

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents