Replacing The Option Cards; Removing The User Interface Module - Christie Boxer 4K Series Service Manual

Hide thumbs Also See for Boxer 4K Series:
Table of Contents

Advertisement

Replacing the option cards

The projector comes standard with two DisplayPort cards and two 3G/HD/SDI cards.
Estimated replacement time: 1 minute
1. On the option card you want to remove, loosen the two captive screws and pull out the option
card.
2. Replace the option card.
3. To re-install, follow these steps in reverse order.

Removing the user interface module

The user interface module mounts to the electronics side of the projector.
Using the side panel display, the user can view and control input and output activities on the projector
The near field communication (NFC) reader on the user interface module enables Android devices to
communicate with the projector, regardless if the projector is powered on or not.
Estimated replacement time: 10 minutes
Boxer 4K Service Guide
020-101699-04 Rev. 1 (02-2018)
Copyright
2018 Christie Digital Systems USA, Inc. All rights reserved.
©
Electronics
60

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Boxer 4k30Boxer 4k20Mirage 304kBoxer 30

Table of Contents