8

8.1 Installing Power Supply and Distribution Devices

8.1.1 (Optional) Installing Battery Packs

Prerequisites
Pre-fab. modules have been installed.
Context
Battery packs are installed inside the battery cabinet.
Preparations
Tools: Phillips screwdriver, pallet truck, adjustable wrench, protective gloves
Materials: insulation tape, battery pack, copper bar or cable
Documents: battery cabinet-1 configuration table, battery pack wiring diagram
Skill requirement: personnel qualified for installing batteries
Procedure
Step 1 Determine the battery pack installation position based on the battery cabinet-1 configuration
table.
Step 2 Take out mounting ears from the battery pack fitting bag, and install the mounting ears on the
battery pack using eight M4 screws.
Issue 03 (2020-06-09)
Installing Devices Inside Pre-fab.
For details about how to install a battery pack, seeESS-240V12-2x(9AhBPVBA, 7AhBPVBA) Battery Box
Quick Guide
delivered with the product.